SFN 2182 overhaul

During 2011 passenger car SFN2182 has been withdrawn from service and is being overhauled at Eveleigh.

Picture 079

Work has commenced repairing the roof area.

Picture 080

The malthoid covering on the roof was in need of repairs and the end timbers required replacement.

Picture 081

Whilst most of the roof will only require painting some sections had to be removed to repair rotten timbers in the roof.

Picture 082

It soon became obvious that this was not going to be a quick repair job. (Is it ever?)

Picture 084

What started off as a simple job soon became a much bigger than expected task.

Picture 085

The end sections of malthoid were removed to repair the wood work. All metal sections were treated to prevent rust.

Picture 086

A new wooden section will be manufactured and spliced into place before the malthoid material is reapplied.

Picture 089

New wooden mouldings were cut and shaped to the correct roof profile. These sections were primed and reapplied before the malthoid was replaced.

Picture 088

At the same time the removal of body rust began. This project will continue throughout the year and the car will receive a mechanical overhaul during this period. More updates throughout the year.

Sunday, February 6, 2011

Spot the difference

In recent times Railcorp has let a contract to refurbish parts of the interior and exterior of the Large Erecting Shop at Eveleigh.

Picture 127

During 2011 the exterior of the building will change to resemble the original appearance of the building. Do you see any changes in these images?

Picture 128

Those with an eye for detail will notice that the toilet block on the right hand side of the building is no longer standing. This was a  later addition to the building and was recently demolished. In the months ahead new wooden doors made to the original pattern and drawings will replace the corrugated iron doors on all 6 roads.