Sunday, December 12, 2010

Another cab update

With all the flat sections ready to assemble into a box shape a frame was manufactured to ensure that the cab would be assembled back into the right shape.

Picture 058

The frame was made from RHS and was used to hold the cab panels into the right position.

Picture 059

Both cab sides were held in place and the front spectacle place was able to be bolted into position.

Picture 060

The new metal sections are un-primed unlike the original pieces that are in red primer.

Picture 061

each piece was bolted into place. Eventually the rivet team will come in and replace each bolt with a hot rivet.

Picture 062

The back wall of the cab is reunited with the cab sides.

Picture 063

The cab is now assembled less the roof. Note the new metal section on the left side of the door.

Picture 065

Looking at the back wall from the boiler position.

Picture 066

A look at the other side. Lots of new metal in the back section.

Picture 067

Slowly each rivet hole has a bolt and nut screwed into place to hold the sections together.

Picture 068

A new roof will be manufactured and be fitted soon. Further updates will be posted during 2011.