Saturday, August 22, 2009

Another big day

There was much activity at Eveleigh today.


The drawgear carrier plates for L516 were prepared for installation.

After heating in the forge they were shaped to the correct profile.

A correct shape carrier plate ready almost to install.


New battery box lids were manufactured for loco 4464.


Follow the restoration of 4464 here.

The battery box frame for L516 was needle gunned and primed ready to reinstall.


All metal surfaces are painted with primer.


A battery box frame almost ready to assemble.